A Walk that returned an error before any result cancelled the run like
an ordinary cancellation: the job was saved as neither complete nor
failed. The listing failure is now recorded first, and the run is saved
as failed with its cursor where it was. Start still returns the error,
so the job is left to a later run, which lists again.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Signed-off-by: Feng Ruohang <rh@vonng.com>
Key rotation authorized the version as the copies in all pools merge
it, but rewrote the copy that GetObjectInfo returned, routed by the
pools layer to the pool of the latest version of the key. Where the
copies differ, it rewrote metadata it had not authorized; where another
pool held another write of the same version ID, it replaced that
write's sealed key without re-encrypting its data, which no longer
decrypted. The rewrite also stored the metadata without the tags and
the expiry, which a read returns apart from it.
Rotation now authorizes both the copy it rewrites and the merged
version, and rewrites exactly that copy in its own pool. A version read
from a pool that a decommission or a rebalance is moving is left to a
later run, checked again right before the write, so that the source of
the move does not change under it. The tags and the expiry are kept.
A pool-state change during the commit itself affects every write of
the pools layer and is left to a fix there.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Signed-off-by: Feng Ruohang <rh@vonng.com>